Journeyman Lineworker
Tennessee Valley Regional Power Cooperative · Knoxville, TN
Mar, 2017 · Present
Perform energized work on 12.47kV–69kV overhead distribution and sub-transmission lines using rubber gloving and hot-stick methods, completing 1,200+ energized tasks with zero contacts or flash incidents.
Lead a 4-person line crew on new construction, reconductoring, and pole change-outs, replacing 350+ deteriorated poles and 28 miles of conductor across rural and suburban Knox County.
Install, phase, and test 600+ pole-mounted and pad-mounted transformers, cutting new-service connection backlog from 6 weeks to 9 days.
Write and execute switching orders with system operators for 150+ planned outages per year, holding average customer outage duration 22% below cooperative target.
Respond to 24/7 trouble calls and storm callouts, restoring power to 95% of affected members within 48 hours on 12 major-event declarations.
Mentor 9 apprentices through climbing, gloving, and rescue qualifications; serve as crew safety lead for tailboards, PPE audits, and pole-top/bucket rescue drills.
Storm Restoration Lineworker
Volt Line Services (Utility Contractor) · Chattanooga, TN
May, 2014 · Feb, 2017
Deployed on 30+ mutual-aid storm restoration events across 9 states, including Hurricanes Matthew and Hermine and the 2015 Kentucky ice storm.
Rebuilt 400+ broken poles, crossarms, and spans of downed primary under emergency switching, working 16-hour shifts with zero recordable injuries.
Restored service to an estimated 180,000+ customers as part of 6-person contract crews embedded with host-utility storm centers.
Operated bucket trucks and digger derricks in flooded and wooded right-of-ways, setting 40-ft to 55-ft poles in rock and saturated soil.
Performed damage assessment and wire-down guarding, documenting 2,500+ damage points in host-utility GIS outage apps.
Apprentice Lineworker
Smoky Mountain Electric Membership Corporation · Maryville, TN
Jun, 2010 · Apr, 2014
Completed 8,000-hour DOL-registered apprenticeship, topping out as journeyman with 98% average on progression exams.
Installed and maintained overhead single- and three-phase distribution on 7.2/12.47kV circuits, framing 250+ poles under journeyman supervision.
Pulled, terminated, and spliced URD primary cable for 14 residential subdivisions, energizing 1,100+ new underground services.
Climbed wood poles up to 60 ft daily with hooks and fall-restriction devices; certified annually in pole-top rescue.
Assisted with 3-phase regulator, recloser, and capacitor bank installations that improved feeder voltage profiles by 4%.
Groundman
Cumberland Utility Constructors · Knoxville, TN
Mar, 2009 · May, 2010
Supported 5-person line crews by framing poles, staging material, and rigging loads for 200+ pole sets and transfers.
Operated digger derrick augers and backhoes to dig 300+ pole holes and URD trenches to utility depth specifications.
Maintained truck inventories of hardware, insulators, and conductor, reducing job-site material delays by 30%.
Set up work zones and traffic control per MUTCD standards on 2-lane and 4-lane roadways with zero public incidents.